Quartz and granite on Madison's south side, laser templated on site and fabricated in our DeForest shop

Yes. Fitchburg is 25 minutes from the DeForest shop where we cut the stone. Tops are laser templated on site once the cabinets are set, cut on CNC equipment in DeForest, and installed by our own crews. QBC LLC's Countertops Division runs 5 to 10 large multifamily projects a year plus 10 to 15 smaller projects a month, most of them in Dane County, and Fitchburg is one of the regular stops.
Projects completed or under contract, with the general contractor:
The same shop has set tops on roughly 75 completed Madison-area projects.
The same scope as our countertops service page: quartz and granite supplied and installed under one contract, laser templating after cabinets are set, fabrication in DeForest, edge profiles, cutouts, and seams built to one standard across the project, and stone window sills from the same shop.
Send plans to bids@questbuildingcorp.com, or call 608-665-3304 and ask for Sales. We take off and bid every requested scope, labor and materials, under one contract. Most of our work comes through general contractors; if you're a developer who wants QBC on the job, see how developers put QBC on a project.
Yes, through our countertop packages: granite and quartz installed, starting at $3,000, quoted from a simple hand drawing. Everything else on this page is for general contractors and developers.
This page covers one scope in one city. For the full scope, lead times, and FAQs, see the service page.
This city is part of our Dane County coverage.