QBC LLC is a countertop contractor for multifamily projects across Wisconsin and Northern Illinois. Quartz and granite, fabricated in DeForest and installed under one contract.







Commercial countertop installation is the templating, fabrication, and setting of kitchen, bath, and common area countertops across a multifamily or commercial building, unit after unit, on the general contractor's schedule. It is CSI Division 12 work. The difference from a single kitchen is volume: one color across 200 units, one seam standard, one delivery sequence by building and floor.
QBC LLC fabricates and installs quartz and granite countertops for multifamily and commercial projects across Wisconsin and Northern Illinois. We laser template on site after the cabinets are set, program and cut the stone in our DeForest, Wisconsin shop, and install with our own crews. We are a Cambria dealer. Countertops go under the same contract and the same project manager as our framing, finish carpentry, and cabinetry, so the handoff between cabinets and tops is ours to manage, not yours. Our Countertops Division runs 10 to 15 smaller projects a month alongside its large multifamily work.
What you get:
%2520(1).jpeg)
Homeowner or small project? See our countertop packages: granite and quartz installed, starting at $3,000, quoted from a simple hand drawing.
Fill out the form below, and find out how easy building can be with QBC’s expert services.
%20(1).jpg)
Every top goes through the same four steps. First, laser templating on site once cabinets are permanently set, which captures wall irregularities and cutouts to the millimeter. Second, CAD programming, where the template becomes a cut file and seams are placed. Third, fabrication in our DeForest shop on Park Industries equipment: a SABERjet XP sawjet for cutting, a TITAN CNC router with a Z-Laser projector for cutouts and edge profiles, and a YUKON II bridge saw, with a water recycling system behind all of it. Fourth, installation by our own crews. Stewardship is one of our twelve core tenets, and recycling the water we cut with is one way we practice it.
A fit error on one kitchen is a callback. The same error across 60 identical units is a schedule problem. Laser templating after the cabinets are set removes the guesswork, and the same crew that templated the unit usually installs it.
%2520(1).jpeg)
Quartz is the most specified top in new multifamily work. Non-porous, no sealing, and consistent color from the first unit to the last.
Granite gives natural stone at a lower material cost on many colors, with heat resistance that suits common area and amenity kitchens. It needs periodic sealing, which matters to the property manager after turnover.
Manufacturers recommend fabricating a project from slabs of the same production lot. On large multifamily orders we buy the full project quantity in one lot, so color, pattern, and finish match across phases and buildings instead of drifting slab to slab.
We price quartz and granite in Good, Better, and Best tiers and provide physical samples so you can compare against the original spec. We also fabricate bar and restaurant tops, typically as smaller projects between the large ones. For a longer comparison, read how to choose the right countertop material for multifamily construction.
Laser templated, fabricated in DeForest, and installed by the crews that set the cabinets, under one contract and one project manager.
Quartz offers the best return for most rental properties. It needs no sealing, resists the stains and scratches that drive turnover costs, and holds a consistent look across every unit. Granite is close on durability but needs periodic sealing. Laminate costs less up front and gets replaced sooner.
No. Countertop installation requires base cabinets to be permanently installed, level, and secured. Attempting to template or install countertops before cabinets are finalized leads to fit issues, gaps, and callbacks, expensive problems that delay your project.
QBC fabricates and installs quartz and granite countertops. We are a Cambria dealer, and we offer quartz and granite in Good, Better, and Best tiers. Fabrication is done in our DeForest, Wisconsin shop.
Standard lead time is 30 days or less from template to installation. Smaller projects can often be turned in two weeks when the schedule allows. Large multifamily orders are planned months ahead during preconstruction.
Yes, volume matters. Actual costs vary based on material, edge profiles, cutouts, and complexity. Volume pricing on large projects can reduce per unit costs by several percentage points. We provide a detailed bid after reviewing your plans and material selections.