Countertop Installation in Madison, WI

Quartz and granite, laser templated on site and fabricated 15 minutes away in DeForest

Does QBC install countertops in Madison?

Yes. Madison is the shortest drive our Countertops Division makes. Tops are laser templated on site once the cabinets are set, cut on CNC equipment in our DeForest shop 15 minutes up Highway 51, and installed by our own crews. QBC LLC has fabricated and installed quartz and granite on roughly 75 completed Madison projects, most of them multifamily, and runs 10 to 15 smaller projects a month alongside the large ones.

What has QBC installed in Madison?

Projects completed or under contract, with the general contractor:

  • Rise Apartments (McGann Construction): granite countertops
  • McKee Road Apartments (McGann Construction): countertops
  • Dylin ApartHotel (Stevens Construction): countertops and sills
  • The Manchester (Stevens Construction): countertops and sills
  • Market Square Building A1 (Stevens Construction): countertops, sills, and finish carpentry
  • Vista West Senior Living (Stevens Construction): countertops, sills, and trim, 174 units
  • The Hamptons (Stevens Construction): countertops, 59 units
  • Hidden Creek Phase 3 (Stevens Construction): countertops and trim, 97 units
  • Maxwell and 320 E Wilson (Stevens Construction): countertops
  • NP Merchant Place (Connery Construction): countertops and cabinets, 124 units
  • Midpoint Meadows and Blue Wren (McGann Construction): countertops, trim, and cabinets
  • Capitol Lakes Bassett Place (McGann Construction): countertops and framing

What does the countertop scope include?

The same scope as our countertops service page: quartz and granite supplied and installed under one contract, laser templating after cabinets are set, fabrication in DeForest, edge profiles, cutouts, and seams built to one standard across the project, and stone window sills from the same shop. Large orders are bought in one production lot so color matches from the first unit to the last. Cabinetry and finish carpentry are separate QBC scopes run by the same project manager.

How does a Madison countertop project run?

Color and slab approvals, edge profiles, and the sink and cutout schedule are signed off in preconstruction and stone is ordered against lead times. Once base cabinets are permanently set, we laser template, program the cut file, fabricate, and install, usually the same crew that templated the unit. Standard lead time is 30 days or less from template to installation, and Madison jobs are close enough that smaller projects can turn in two weeks when the schedule allows. Four rounds of punch, then closeout with a 1 year labor warranty on installation.

How do I get QBC on a Madison project?

Send plans to bids@questbuildingcorp.com, or call 608-665-3304 and ask for Sales. We take off and bid every requested scope, labor and materials, under one contract. Most of our Madison work comes through general contractors; if you're a developer who wants QBC on the job, see how developers put QBC on a project.

FAQs

Do you install countertops for Madison homeowners?

Yes, through our countertop packages: granite and quartz installed, starting at $3,000, quoted from a simple hand drawing. Everything else on this page is for general contractors and developers.

Can countertops go in before cabinets are finished?

No. We template only after base cabinets are permanently set, level, and secured. Templating early is how a fit error on one kitchen becomes a fit error on 60.

Quartz or granite for a Madison apartment project?

Quartz is the most specified top in new multifamily work: non-porous, no sealing, consistent color. Granite gives natural stone at a lower material cost on many colors but needs periodic sealing. We price both in Good, Better, and Best tiers with physical samples.

Who is my point of contact?

One dedicated QBC project manager, from bid through closeout, for every scope we hold.